Profit Center Accounting: Assignment Monitor
This transaction is used to monitor the assignment of master data to profit centers. Internal orders, business processes, cost centers, cost objects, materials and work breakdown structure lists can be displayed for master data that has been assigned a profit center and for non assignments to a profit center. Profit centers are posted via these assignments, so it is important to ensure that all master data has been assigned.
Profit Center Accounting: Transfer Payables/Receivables
This transaction is used to pull accounts payable and receivable line items into profit center accounting. The line items are created from the profit center accounting assignment on the offset posting to the accounts payable and accounts receivable posting. Select the period and fiscal year to be posted and the relevant company codes and then execute.
Copy Cost Center Groups
Use this transaction to copy cost center groups to profit center groups within the same controlling area. This is a useful utility if your cost center groups are similar to your profit center groups. Enter the cost center group and execute. Once created, the profit centers within the profit center group can be changed. The utility also gives you the ability to select the standard hierarchy only and then assign the profit centers into groups in a second step.
Copy Cost Centers
Use this transaction to create profit centers from cost centers within the same controlling area. Select the cost center group and execute. This transaction will create profit centers for all the cost centers within the cost center group selected.
Display Profit Center Change Documents
This transaction will report on changes made to the profit center master. A date range can be selected. The changes are date and time stamped and you can drill down to review the old/new field value input.
Change Plan Costs/Revenues: Characteristics
This transaction is used to plan costs and revenue elements at the profit center level. Enter the version of the plan, the period range, the fiscal year, the company code, the profit center and the account for a default planning layout. The layout can be changed via the menu path
Go to • Next Layout. Select Enter in free form input mode and you can enter the plan by period.
Display Plan Costs/Revenues: Characteristics can be changed via the menu path Go to • Next Layout. Select Enter to display the plan by period.
Display Document
Use this transaction to display a profit center accounting document. Select one of the standard delivered layouts, the document number range, fiscal year, leave the document type as the default and click Execute to display the document data.
Create Cost Estimate with Quantity Structure
This transaction is used to create a standard cost estimate for a material with a quantity structure. Enter the material and plant for the cost estimate. Then enter the costing variant, which controls the type/cost components to be included in the estimate and the quantity structure (i.e., BOM's and Routings). Enter the costing version and the costing lot size (if left blank, the material master will determine the costing lot size) and click Enter. The standard cost estimate will be calculated which can be analyzed by cost component or by cost element.
Display Cost Estimate with Quantity Structure
Use this transaction to display the cost estimate for a material with a quantity structure. Enter the material and plant for the cost estimate, the costing variant, version and click Enter. The standard cost estimate will be displayed which can be analyzed by cost component or by cost element.
Price Update
This transaction is used to mark and release a standard cost estimate for a material that has been created using transaction CK11N. Before marking can take place, the period for marking must be activated. Enter the posting period, fiscal year and activate marking. Then choose the company code and plant for the update; you can further restrict the selection by entering a material number range. Then execute marking, which typically is for a future period and then follow up with releasing the standard cost, which typically results in a revaluation of the materials inventory.
Edit Costing Run
This transaction is used to create a standard cost estimate, report, mark and release for a range of materials with a quantity structure. This transaction is the same as transaction CK11N and CK24 but for multiple materials at the same time. Enter a costing run number and date, click Create and enter a description. Then proceed to enter the control settings (e.g., costing variant) in the General sub area, then run the cost estimate, mark and release in the Processing sub area and review the results in the Costing Results area.
Create Additive Cost
This transaction is used to create a manual cost estimate for a material, save it and have it be included in a standard cost estimate using transaction CK11N. Enter the material and plant, the costing variant and click Enter. Then various costing methods can be chosen and then saved. Note that to have the additive cost estimates included in the standard cost estimate using transaction CK11N, the cost variant must be customized to allow it to accept additive cost estimates.

CK75N
Change Additive Cost
Use this transaction to change a manual cost estimate for a material. Enter the material and plant, the costing variant and click Enter. Then various costing methods can be chosen and then saved. Note that to have the additive cost estimate included in the standard cost estimate using transaction CK11N, the cost variant must be customized to allow it to accept additive cost estimates.
CK76N
Display Additive Cost
Use this transaction to display a manual cost estimate for a material. Enter the material and plant for the cost estimate, the costing variant and click Enter.
CO43
Actual Overhead Calculation: Collective Processing
This transaction is used to apply overhead costs to multiple production orders based upon an overhead costing sheet as part of the product costing period end closing process. The overhead costing sheet will calculate the overhead cost based on a base cost element and an overhead rate. The production order will typically be debited and a cost center (defined on the costing sheet) will be credited. Enter the plant, the type of production object, period, fiscal year and execute to apply the overhead. To execute the function for one production order use transaction KGI2.
KA01
Create Cost Element
This transaction is used to create a primary cost element. There are two types of cost element. First, a primary cost element, which is typically a one to one match to a general ledger profit and loss account and relates to costs and revenues that are incurred externally to the organization. Additionally, there are secondary cost elements, which are costs incurred internal to the organization and are represented by transactions that exist only in the controlling module. You can create the primary cost elements directly from the profit and loss general ledger master record or you can use this transaction but you first must create a general ledger account. Enter the name and description and then ensure that the correct cost element category is selected (i.e., different cost element categories relate to primary costs, assessments, overhead cost etc.) and then click Save.
KA02
Change Cost Element
This transaction is used to change a cost element. There are two types of cost element. First, a primary cost element, which is typically a one to one match to a general ledger profit and loss account and relates to costs and revenues that are incurred externally to the organization. In addition, there are secondary cost elements, which are costs incurred internally to the organization and are represented by transactions that exist only in the controlling module.
KA03
Display Cost Element
This transaction is used to display a cost element. There are two types of cost element. First, a primary cost element, which is typically a one to one match to a general ledger profit and loss account and relates to costs and revenues that are incurred externally to the organization. In addition, there are secondary cost elements, which are costs incurred internally to the organization and are represented by transactions that exist only in the controlling module.
KA04
Delete Cost Element
This transaction is used to delete a cost element however you can only delete a cost element if no postings have been made to it in the productive client. If postings have been made to the cost element then you must set the deletion flag on the cost element and then execute the archiving process.
KA05
Display Cost Element Changes
Use this transaction to display changes to the cost element master data. A change date from can be selected and/or the user ID, both of which can be left blank to display all changes. Once in the report you can drill down on any changes to display the old/new field value, date of change and the user ID of the individual making the change.
KA06
Create Secondary Cost Element
This transaction is used to create a secondary cost element. There are two types of cost element. First, a primary cost element, which is typically a one to one match to a general ledger profit and loss account and relates to costs and revenues that are incurred externally to the organization. In addition, there are secondary cost elements, which are costs incurred internally to the organization and are represented by transactions that exist only in the controlling module. Enter the name and description and then ensure that the correct cost element category is selected (i.e., different cost element categories relate to primary costs, assessments, overhead cost etc.) and then click Save.
KA23
Display Cost Element Collective
Use this transaction to display/report on multiple cost elements. You have the option to select cost elements individually, by cost element group, by a selection variant or all cost elements within a controlling area within a certain validity period. The list displays the master data information and you have the option to drill down into the actual master record.
KA24
Delete Cost Elements Collective
Use this transaction to delete multiple cost element master record. However, you can only delete a cost element if no postings have been made to it in the productive client. If postings have been made to the cost element then you must set the deletion flag on the cost element and then execute the archiving process. You have the option to select cost elements individually, by cost element group, by a selection variant or all cost elements within a controlling area within a certain validity period.
KABL
Planning Report
Use this transaction to report on overall planning for an internal order. Select an individual internal order, fiscal year, period from/to and plan version. The report can also be displayed in ALV format. The default layout will display plan data by cost element with drill down capability.
KAH1
Create Cost Element Group data.
KAH2
Change Cost Element Group
This transaction can be used to change a cost element group. The cost element group can be created in a hierarchy with nodes and sub nodes with the cost element assigned to the lowest level. Cost element groups can be used for reporting purpose in order to summarize data.
KAH3
Display Cost Element Group
Use this transaction to display a cost element group. The cost element group can be created and displayed in a hierarchy with nodes and sub nodes with the cost elements assigned to the lowest level. Cost element groups can be used for reporting purpose in order to summarize data.
KAK2
Change View "Statistical Key Figures”: Overview
This transaction is used to change multiple statistical key figure master records at one time. A statistical key figure is part of cost center accounting master data and is used in key figure analysis and as a basis for internal allocation such as distributions and assessments. You can also create new statistical key figures using this transaction. Furthermore, you can change existing statistical key figures text, unit of measure and category.
KAK3
Display View "Statistical Key Figures”: Overview
This transaction is used to display multiple statistical key figure master records. A statistical key figure is part of cost center accounting master data and is used in key figure analysis and as a basis for internal allocations such as distributions and assessments. You can display existing statistical key figures text, unit of measure and category.
KB11N
Enter Manual Reposting of Costs
This transaction is used to repost costs manually whereby the original cost element is always retained. This function is designed mainly to adjust posting errors. You should normally adjust posting errors in the application component where they originally occurred. This transaction ensures that external and internal accounting postings are reconciled. You can only adjust posting errors involving one cost accounting object (a cost center or internal order for example) using a transaction-based reposting. Enter the document date, posting date, select the screen variant, the cost object, the receiving cost object and the amount to be posted and save.
KB13N
Display Manual Reposting of Costs
Use this transaction to display a reposting of costs. Correction postings are normally adjusted in the application component where they originally occurred. This transaction ensures that external and internal accounting postings are always reconciled. The adjusted posting errors involve one cost accounting object (a cost center or internal order for example) using a transaction-based reposting. Enter the document number and click Enter.
KB14N
Reverse Manual Reposting of Costs

Use this transaction to reverse a reposting of cost. Correction postings are normally adjusted in the application component where they originally occurred. This transaction ensures that external and internal accounting postings are always reconciled. The adjusted posting errors involve one cost accounting object (a cost center or internal order for example) using a transaction-based reposting. Input the document number and click Enter. The reposting sending and receiving cost objects are reversed and then save the document.
KB21N
Enter Direct Activity Allocation
Use this transaction for direct activity allocation, which involves the measuring, recording, and allocating of business services performed. To do this, you must create the appropriate cost activities and tracing factors (allocation bases, which can be used as cost drivers). These are known as activity types in cost center accounting. Activity allocation occurs, for example, when business transactions are confirmed or activities are recorded. The system multiplies the activity produced by the activity price of the activity type.
KB23N
Display Direct Activity Allocation
Use this transaction to display an activity allocation. Activity allocation involves the measuring, recording, and allocating of business services performed. To do this, you must create appropriate cost activities and tracing factors (allocation bases, which can be used as cost drivers). These are known as activity types in cost center accounting. Input the document number and click Enter.
KB24N
Reverse Direct Activity Allocation
This transaction is used to reverse a direct activity allocation made using transaction KB21N. Enter the document date, posting date and document number of the transaction you want to reverse. Execute the transaction and the reverse activity allocation will be displayed. Save the posting and a new document number will be issued for the reversal.
KB31N
Enter Statistical Key Figures
This transaction is used to enter actual statistical key figures, which can be used as a basis for internal allocations, such as distributions and assessments and key figure analysis. Statistical key figures can be planned and actuals posted on a cost center, internal order, or other cost object. Enter actual statistical key figures to cost centers or internal orders using this transaction. Enter the document date, posting date, select the screen variant, the statistical key figure, the receiving cost center or internal order and the quantity to be posted and save.
KB33N
Display Statistical Key Figures
This transaction is used to display the actual statistical key figures entered, which can be used as a basis for internal allocations, such as distributions and assessments and key figure analysis. Statistical key figures can be planned and actuals posted on a cost center, internal order, or other cost object. Input the document number and click Enter to display the posting.
KB34N
Reverse Statistical Key Figures reverse. Click Enter to display the reverse statistical key figure posting. Click Save to post the new document number for the reversal.
KB41N
Enter Manual Reposting of Revenues
This transaction is used to repost revenues whereby the original cost element is always retained. This function is designed mainly to adjust posting errors. You should normally adjust posting errors in the application component where they originally occurred. This transaction ensures that external and internal accounting postings are always reconciled. You can only adjust posting errors involving one cost accounting object (a cost center or internal order for example) using a transaction-based reposting. Enter the document date, posting date, select the screen variant, the cost object, the receiving cost object and the amount to be posted and save.
KB43N
Display Manual Reposting of Revenues
Use this transaction to display a reposting of revenues. Correction postings are normally adjusted in the application component where they originally occurred. This transaction ensures that external and internal accounting postings are always reconciled. The adjusted posting errors involve one cost accounting object (a cost center or internal order for example) using a transaction-based reposting. Input the document number and click Enter.
KB44N
Reverse Manual Reposting of Revenues
Use this transaction to reverse a reposting of revenues. Correction postings are normally adjusted in the application component where they originally occurred. This transaction ensures that external and internal accounting postings are always reconciled. The adjusted posting errors involve one cost accounting object (a cost center or internal order for example) using a transaction-based reposting. Input the document number and click Enter. The reposting sending and receiving cost object reversal is then displayed, click Save to post the document.
KB65
Enter IAA Reposting: Document Row Selection
Use this transaction to repost cost from one cost object to another that has previously been posted using activity allocation. This function is designed mainly to adjust posting errors. You should normally adjust posting errors in the application component where they originally occurred. When reposting a line item, the full amount and quantity is reposted. Note: once a document has been "reposted" it cannot be corrected by another reposting transaction. Input the original document number that needs to be corrected, click Enter to display and correct and then save the document.
KB66
Display IAA Reposting: Document Row Selection
Use this transaction to display a reposting of an internal activity allocation. Correction postings are normally adjusted in the application component where they originally occurred. This transaction ensures that external and internal accounting postings are always reconciled. The adjusted posting errors involve one cost accounting object (a cost center or internal order for example) using a transaction-based reposting. Enter the document number and click Enter.
KB67
Reverse IAA Reposting: Document Row Selection
Use this transaction to reverse a reposting of an internal activity allocation. Input the document number and click Enter. The reposting sending and receiving cost objects are reversed and then save the document to post the reversal.
KBH1
Create Statistical Key Figure Group
This transaction is used to create a statistical key figure group. When several statistical key figures have been created, a statistical key figure group may be necessary for reporting and monitoring the contents of the group. For example, a statistical key figure (SKF) type group could be created for all SKFs managed by manufacturing or all SKFs managed by finance, etc. This will help assign responsibility for large numbers of SKFs. Enter the SKF group name, click Enter, assign the SKF's to nodes in the group and save.
KBH2
Change Statistical Key Figure Group
Use this transaction to change a statistical key figure group. Enter the SKF group name, click Enter, change the SKF assignment and save your changes.
KBH3
Display Statistical Key Figure Group
Use this transaction to display a statistical key figure group. Enter the SKF group name, click Enter, and review the SKF assignment.
KCH1
Create Profit Center Group
This transaction is used to create a profit center group, which is a hierarchy structure of profit centers. Profit center groups are used for profit reporting, allocations or in various planning functions, where it is desirable to display profit data at a high level of detail. Enter the profit center group key, which will be the top level of the hierarchy, click Enter, create lower level nodes, assign profit centers to the lowest node and click Save.
KCH2
Change Profit Center Group
Use this transaction to change a profit center group, which is a hierarchy structure of profit centers. Profit center groups are used for profit reporting, allocations or in various planning functions, where it is desirable to display profit data at a high level of detail. Enter the profit center group key, which will be the top level of the hierarchy, click Enter, create or change lower level nodes, assign/reassign profit centers to nodes and click Save.
KCH3
Display Profit Center Group
Use this transaction to display a profit center group, which is a hierarchy structure of profit centers. Profit center groups are used for profit reporting, allocations or in various planning functions, where it is desirable to display profit data at a high level of detail. Enter the profit center group key and click Enter to display the hierarchical structure.
KCH5N
Standard Hierarchy for Profit Centers Change

to change it, first, when maintaining the profit center master data and second, using this transaction you can also maintain the profit centers master data.
KCH6N
Standard Hierarchy for Profit Centers Display
Use this transaction to change the standard hierarchy for profit centers, which is a special type of profit center group that contains all the profit centers in a controlling area. Profit center master data is required to be assigned to at least one level in the profit center standard hierarchy. Input the profit center group key and click Enter to display the hierarchical structure.
KE21N
CO-PA Line Item Entry
This transaction is typically only used in exception circumstances since data is usually transferred to Profitability Analysis (CO-PA) automatically. However, if a correction posting is required then use this transaction. Enter the appropriate document type, the posting date, select the valuation type, currency setting, click Enter, input the characteristics, value fields and origin data, if necessary and then click Save.
KE24
Line Item Display - Actual Data
This transaction is used to report on actual line item postings in Profitability Analysis (CO-PA). Selection criteria include record type, which will narrow the list to the origin of the posting. The layout display can be changed to suit user requirements.
KE25
Line Item Display - Plan Data
This transaction is used to report on plan line item postings in Profitability Analysis (CO-PA). Selection criteria include record type, which will narrow the list to the origin of the posting. The layout display can be changed to suit user requirements.
KE27
Periodic Valuation
Use this transaction is used to periodically valuate actual data, which has previously been posted to Profitability Analysis (CO-PA). The system posts the difference between the original values of the line item and the new values in a new, separate line item. For valuation using material cost estimates, you can choose the alternative option of displaying the periodically calculated values separately from the original values. This function is available for the record types A (incoming sales orders) and F (billing data) as well as user-defined record types, which you select on the initial screen. Also, at execution time select the period for valuation. The program can be executed in update or test mode. Once you have performed periodic valuation in update mode, you can display the new values in the information systems reports.
KE2B
Subsequent Posting Incoming Sales Orders
Use this transaction to retransfer incoming sales order from SD to Profitability Analysis (CO- PA). Errors may occur for example, if the standard cost valuation of a material has not been released at the time of the transfer. The system saves the "original" records that contain errors in a separate table, which can be viewed using this transaction. Once the error has been corrected you can use this transaction to retransfer the sales order to CO-PA.
KE2C
Delete Incoming Sales Orders Containing Errors
Use this transaction to delete any errors from the transfer of incoming sales orders from SD to Profitability Analysis (CO-PA). The system saves the "original" records that contain errors in a separate table, which can be viewed using transaction KE2D. Once the error has been corrected and retransferred using transaction KE2B you can use this transaction to delete the sales order from the error table.
KE2D
Display Incoming Sales Orders Containing Errors
This transaction is used to analyze errors from the transfer of incoming sales orders from SD to Profitability Analysis (CO-PA). You can value incoming sales orders (as expected revenues) and transfer them from SD to CO-PA in order to obtain an early estimate of anticipated profits. Errors may occur for example, if the standard cost valuation of a material has not been released at the time of the transfer. The system saves the "original" records that contain errors in a separate table, which can be viewed using this transaction. Once the error has been corrected you can use transaction KE2B to retransfer the sales order.
KE30
Execute Profitability Report
This transaction is used to access and execute Profitability Analysis (CO-PA) reports. When you call up a drill-down report, you can have the system either select new data or read saved report data that was selected and saved at an earlier point in time. In order to make it as easy as possible for users to execute a report, SAP lets you make most of the settings when you define the report. When you execute the report, you can also determine how the report is displayed and make the appropriate settings. Select the report, click Execute, input section criteria and then execute the report.
KE31
Create Profitability Report
Use this transaction to create a Profitability Analysis (CO-PA) report. CO-PA allows the user to "slice and dice" information derived from other SAP modules (customer billing, internal orders, direct FI postings) to provide a view of customer and product profitability. When creating a report, the user will select which variables, characteristics and value fields are contained in the report. A CO-PA report can be created without or with a form. A form will allow the user, to create separately, a form/report layout that can be standardized and used across multiple reports.
KE32
Change Profitability Report
Use this transaction to change a Profitability Analysis (CO-PA) report. CO-PA allows the user to "slice and dice" information derived from other SAP modules (customer billing, internal orders, direct FI postings) to provide a view of customer and product profitability. The user can change which variables, characteristics and value fields are contained in the report.
KE41
Create Condition Records
This transaction is used to create condition records for use in Profitability Analysis (CO-PA) for valuation purposes. For example, when transferring SD Billing documents for SD to CO-PA a valuation for sales commission or freight expense can be calculated and added to the valuation of the CO-PA posted line item. Enter the condition type, click Enter, select the key combination for the condition record, enter your selection criteria, click Enter and then maintain the condition record.

KE42
Change Condition Records
Use this transaction to change a condition record which is used for valuation purposes in Profitability Analysis (CO-PA). For example, when transferring SD Billing documents from SD to CO-PA a valuation for sales commission or freight expense can be calculated and added to the valuation of the CO-PA posted line item. Enter the condition type, click Enter, select the key combination for the condition record, enter your selection criteria, click Enter and then maintain the condition record.
KE4L
Create Pricing Report
Use this transaction to create a report on the condition records you created using transaction KE41. Enter the two-character code and name of the report and click Select Fields. Select the fields for the report and then select the tables that contain the condition records. Lastly, select the format and save the report. You can execute the report using transaction KE4Q.
KE4N
Change Pricing Report
This transaction is used to change a report on the condition records that were created using transaction KE4L. Enter the two-character code and name of the report and click Enter. Select the fields to be deleted or add new fields for the report and the tables that contain the condition records. Lastly, select the format and save the report. You can execute the report using transaction KE4Q.
KE4Q
Execute Pricing Report
Use this transaction to execute a report created using transaction KE4L. Input the 2-character report code and execute.
KE51
Create Profit Center
This transaction is used to create a profit center, which classifies income and expense transactions according to the internal responsibility of the organization, for example, by product lines, geography, division etc. To accomplish this, all internal orders and cost centers are attached to a single profit center, while all revenue-related items (including cost of goods sold at standard) are posted directly to a single profit center. Apart from the profit center number itself, the following fields are also maintained as part of the profit center master data: analysis period from/to, name, user responsible, lock indicator and assignment to company codes.
KE52
Change Profit Center
Use this transaction to change a profit center. The following fields are maintained as part of the profit center master data: analysis period from/to, name, user responsible, lock indicator and assignment to company codes.
KE53
Display Profit Center

KE54
Delete Profit Centers
This transaction is used to delete a profit center but before the system can do this it carries out the following checks; the profit center cannot be deleted if transaction data has already been posted to it and/or the profit center is assigned to the following objects: cost center, material and/or business processes.
KE56
Assignment of Profit Centers to Company Codes - Change
This transaction allows you to change the company code assignments for a large quantity of profit centers without having to access master data maintenance for each single profit center. If you do not change the company code assignments the profit center is assigned to all the company codes. A column is inserted for each company code selected indicating for each profit center whether or not it is assigned to the company code in question. Note that you can select no more than 20 company codes at a time. To process any further company codes, repeat the transaction. Note that a company code assignment cannot be undone if the profit center has cost centers assigned to it, which are contained in the company code in question or the profit center has materials assigned to it, which are contained in the company code in question.
KE5Y
Profit Center: Plan Line Items
Use this transaction to provide a list of all profit center plan posting documents and line items matching the user's selection criteria. This report can be used as an aid in researching problems driven by postings in particular accounts and profit centers. The list layout can be changed to suit business requirements.
KE5Z
Profit Center: Actual Line Items
Use this transaction to provide a list of all profit center actual posting documents and line items matching the user's selection criteria. This report can be used as an aid in researching problems driven by postings in particular accounts and profit centers. The list layout can be change to suit business requirements.
KEDE
Maintain Derivation Rules
This transaction is used to maintain the rules for deriving a Profitability Analysis (CO-PA) characteristic to be used in CO-PA postings. The characteristics value is maintained using transaction KES1.
KEPM
CO-PA Planning
This transaction contains a user friendly way of executing the process for revenue planning including the ability to copy the plan values from last year's sales data, display the data, increase or decrease the plan amounts using a %, integrate plan quantities with manufacturing (i.e., LIS /spreadsheets), perform top down planning, manual manipulation for customer/product plan sales quantities and save a copied version of the plan.
KES1
Change Characteristic Values
Use this transaction to maintain characteristic values for new characteristics defined in Profitability Analysis (CO-PA). Once maintained you can define derivation rules using transaction KEDE to assign these characteristics to postings in CO-PA. Double-click the

KEU1
Create CO-PA Actual Assessment Cycle
This transaction is used to create an assessment cycle that can be used transfer actual overhead costs to Profitability Analysis (CO-PA) for customer product profitability analysis below the contribution margin line. Enter the cycle name and the start date and click Enter. Then enter the controlling area and the type of CO-PA analysis used, i.e., costing or account based. Then create a segment for the assessment, which involves selecting the sender objects and receiving CO-PA segments and the method of assessment. Execute the assessment cycle using transaction KEU5.
KEU2
Change CO-PA Actual Assessment Cycle
Use this transaction to change the assessment cycle created using transaction KEU1.
KEU4
Delete CO-PA Actual Assessment Cycle
Use this transaction the delete the assessment cycle created using transaction KEU1.
KEU5
Execute CO-PA Actual Assessment Cycle
This transaction is used to transfer overhead costs to Profitability Analysis (CO-PA) for customer product profitability analysis below the contribution margin line. Enter the period start from/to, fiscal year and enter the cycle name and start date. The program can be run in test mode and/or in background. Leave the Detail List Selection checked to see the details of the sender and receiver posted amounts in the program output.
KEU7
Create CO-PA Plan Assessment Cycle
This transaction is used to create an assessment cycle that can be used to transfer plan overhead costs to Profitability Analysis (CO-PA) for customer product profitability analysis below the contribution margin line. Enter the cycle name, start date and click Enter. Then enter the controlling area and the type of CO-PA analysis used, i.e., costing or account based. Then create a segment for the assessment, which involves selecting the sender objects and receiving CO-PA segments and the method of assessment. Execute the assessment cycle using transaction KEUB.
KEU8
Change CO-PA Plan Assessment Cycle
Use this transaction to change the assessment cycle created using transaction KEU7.
KEUA
Delete CO-PA Plan Assessment Cycle
Use this transaction the delete the assessment cycle created using transaction KEU7.
KEUB
Execute CO-PA Plan Assessment Cycle
This transaction is used to transfer plan overhead costs to Profitability Analysis (CO-PA) for customer product profitability analysis below the contribution margin line. Enter the period start from/to, fiscal year, cycle name and the start date. The program can be run in test

mode and/or in background. Leave the detail list selection checked to see the detail of the sender and receiver posted amounts in the program output.
KGI2
Actual Overhead Calculation: Order
This transaction is used to apply overhead costs to an individual production order based upon an overhead costing sheet as part of the product costing period end closing process. The overhead costing sheet will calculate the overhead cost based on a base cost element and an overhead rate. The production order will typically be debited and a cost center (defined on the costing sheet) will be credited. Enter the production order, period, fiscal year and execute to apply the overhead. To execute the function for multiple production orders, use transaction CO43.
KK01
Create Statistical Key Figure
This transaction is used to create a statistical key figure (SKF) master data, which can be used as the basis for internal allocations. For example, you assess the costs for the cafeteria to the individual cost centers, based on the number of employees in each cost center. To do this, you need to enter the number of employees in each cost center as a statistical key figure. Input the SKF name and click Enter. Then enter the name of the SKF, the unit of measure, and the SKF category, i.e., if the SKF is fixed and will be stored in each period until changed or if the SKF is specific to individual periods.
KK02
Change Statistical Key Figure
Use this transaction to change the statistical key figure (SKF) master data, which is used as the basis for internal allocations. Input the SKF name and click Enter to make an update.
KK03
Display Statistical Key Figure
Use this transaction to display the statistical key figure (SKF) master data, which is used as the basis for internal allocations. Input the SKF name and click Enter to display the master data details.
KK04
Master Data Report: Statistical Key Figures
This transaction is used to display a report of statistical key figures (SKF). Selection criteria include the SKF name, SKF group, unit of measure and SKF category.
KK87
Actual Settlement: Product Cost Collector
This transaction is used for actual settlement of a single product cost collector, which is part of the period end closing process. A product cost collector is used in product costing by period and so the cost object in this case is the material. This transaction is used after other period end processes have been executed, such as applying overhead, WIP calculation, and variance calculation. The settlement will clear the cost object at period end. Use transaction CO88 for the settlement of multiple cost collectors.
KK88
Actual Settlement: Cost Object
This transaction is used for actual settlement of a single cost object, which is part of the period end closing process. A cost object is used in product costing but does not control the costs at the production order level or material level; rather it uses as a CO cost object such as an internal order. This transaction is used after other period end processes have taken place such as applying overhead, WIP calculation and variance calculation. The settlement will clear the cost object at period end. Use transaction KK89 for the settlement of multiple cost objects.
KK89
Actual Settlement: Cost Object Collective
This transaction is used for actual settlement of multiple cost objects, which is part of the period end closing process. A cost object is used in product costing but does not control the costs at the production order or material level; rather, it uses a CO cost object such as an internal order. This transaction is used after other period end processes have been executed such as applying overhead, WIP calculation, and variance calculation. The settlement will clear the cost object at period end.
KKA0
Change Cutoff Period
Use this transaction to establish the cut off period for the work in progress (WIP) calculation. Work in process is the difference between the debits and credits of a cost object that has not been fully delivered. When it calculates the work in process, the system does not overwrite the results analysis data that proceeds the cutoff period. Enter the results analysis version, click Enter, change the cut off period and click Save.
KKA3
Results Analysis for Sales Order
This transaction calculates results analysis for a single sales order line item (i.e., the sales order line item is the cost object). The valuation for each sales order item can be used to capitalize costs, create reserves or reconcile postings made in FI and Profitability Analysis (CO-PA). Enter the sales order, the item number on the sales order, period, fiscal year, results analysis version and execute to run the calculation.
KKA6
Results Analysis for Sales Order: Enter Data
Use this transaction to manually enter results analysis data when transferring legacy data. Enter the sales order, the item number on the sales order, period, fiscal year, results analysis version and click enter.
KKAK
Actual Results Analysis: Sales Orders
This transaction calculates results analysis for multiple sales order line items (i.e., the sales order line item is a cost object). The valuation for each sales order item can be used to capitalize costs, create reserves or reconcile postings made in FI and Profitability Analysis (CO-PA). Enter the sales order, the item number on the sales order, period, fiscal year, results analysis version and execute to run the calculation.
KKAO
Calculate Work in Progress: Collective Processing
This transaction is used to calculate work in progress (WIP) on multiple open production orders/process orders/product cost collectors. The WIP calculation is based on actual costs and is the difference between the debits and credits posted to the order/cost collector. Enter the plant, the cost object type, WIP calculation period, fiscal year, results analysis version and execute the calculation.
KKAS
Calculate Work in Progress: Individual Processing; Material
This transaction is used to calculate work in progress on an individual material. In this case cost object controlling is conducted by period at the product cost collector/material level. The WIP calculation is based on actual costs and is the difference between the debits and credits posted to that period by product cost collector. Enter the material, plant, WIP calculation period, fiscal year, results analysis version and execute the calculation. Use transaction KKAO for multiple materials.
KKAX
Calculate Work in Progress: Individual Processing; Order
Use this transaction to calculate work in progress (WIP) on an individual open production order/process order. The WIP calculation is based on actual costs and is the difference between the debits and credits posted to the order. Enter the order, WIP calculation period, the fiscal year, the results analysis version and execute the calculation. Use transaction KKAO for multiple production/process orders.
KKC1
Create Cost Object
This transaction is used to create a general cost object that is not represented by a cost object generated by other SAP applications like production orders or sales order line items. A cost object may be created, for example, to track resources used to create an intangible asset. Creating a general cost object will enable you to calculate planned costs and actual costs, transfer costs to other SAP cost objects and analyze plan vs. actual costs. The master data contains the following information: text/naming of the cost object, object currency, name of person responsible, control parameters for the calculation of overhead and a deletion indicator flag.
KKC2
Change Cost Object
Use this transaction to change a cost object previously created using transaction KKC1. The master data contains the following information, text/naming of the cost object, object currency, name of person responsible, control parameters for the calculation of overhead and a deletion indicator flag.
KKC3
Display Cost Object
Use this transaction to display a cost object previously create using transaction KKC1. The master data contains the following information, text/naming of the cost object, object currency, name of person responsible, control parameters for the calculation of overhead and a deletion indictor flag.
KKC7
Create Product Group
This transaction is used to create a product group for drill down and summarization reporting analysis. You may choose to use the product group/hierarchy created in the logistics modules for CO reporting but, in addition, you may create a separate product group just for product cost controlling use only using this transaction. Create the product group number and then proceed to assign materials to hierarchy nodes. Note: each material can only be assigned to one CO product group.
KKC8
Change Product Group

Use this transaction to change the product group that is used solely in the CO product cost controlling application. Enter the product group number and then proceed to change/add materials to hierarchy nodes. Note: each material can only be assigned to one CO product group.
KKC9
Display Product Group
Use this transaction to display the product group that is used solely in the CO product cost controlling application. Enter the product group number and then proceed to display materials to hierarchy nodes. Note: each material can only be assigned to one CO product group.
KKCS
Display Actual Cost Line Items for Cost Objects
Use this transaction to report on cost object line items, which provides a detailed analysis of the posted documents. Furthermore, drill-down capability enables a review of the actual document posted.
KKF1
Create CO Production Order
This transaction is used to create a CO production order for use with other master data in the CO module. You can create a CO production order without a quantity structure and enter the costs using unit costing. Unit costing is a type of spreadsheet that, due to its integration, can be used with existing master data and prices, such as activity prices from cost center accounting. Enter the order type, material number and plant and click Enter. Then enter data such as text, assignments to organizational units and control data such as currency, a statistical indicator and plan integration indicator.
KKF2
Change CO Production Order/QM Order
Use this transaction to change a CO production order for use with other master data in the CO module. Input the order number and click Enter. Review the material number and plant and enter/change data such as text, assignments to organizational units and control data such as currency, a statistical indicator and plan integration indicator.
KKF3
Display CO Production Order/QM Order
Use this transaction to display a CO production order. Input the order number and click Enter. Then display data such as material, plant, text, assignments to organizational units and control data such as currency, a statistical indicator and plan integration indicator.
KKF4
Change Order Planning
This transaction is used to plan the CO production order without a quantity structure using unit costing. Unit costing is a type of spreadsheet that, due to its integration, can be used with existing master data and prices, such as activity prices from cost center accounting. Enter the CO production order, click Enter, and then proceed to manually plan the order.
KKF6M
Create Multiple Product Cost Collectors for Production Versions

a production order costing object but is not limited in lifespan. Enter the plant, material(s) and product cost collector order type and execute.
KKF6N
Display Product Cost Collector
Use this transaction to display multiple product cost collectors that are typically used in a repetitive manufacturing environment/period costing scenario. A product cost collector is like a production order costing object but is not limited in lifespan. Input the plant and material(s), click Enter and use the left hand window pane to navigate the product cost collector list.
KKFB
Display Variance Line Items for Orders
This transaction is a report online items that are based on the variance calculation. The variances calculated represent the difference between target costs and control costs (the control costs can be the net actual costs, for example). The report will show the lines related to the variances categories, which are the causes for the variances.
KKG1
Order: Enter Cost of Sales
This transaction is useful in a scenario where you want to input the cost of sales amount calculated from a non SAP system. Results analysis can then calculate work in progress and reserves for unrealized costs using the actual costs and the cost of sales you entered.
KKG2
Project: Enter Cost of Sales
This transaction is useful in a scenario where you want to input the cost of sales amount calculated from a non SAP system. Results analysis can then calculate work in progress and reserves for unrealized costs using the actual costs and the cost of sales you entered.
KKG3
Sales Order: Enter Cost of Sales
This transaction is useful in a scenario where you want to input the cost of sales amount calculated from a non SAP system. Results analysis can then calculate work in progress and reserves for unrealized costs using the actual costs and the cost of sales you entered.
KKH1
Create Cost Object Group
Use this transaction to create a cost object group using general cost objects created via transaction KKC1, for example, on the basis of responsibility. This is useful for grouping cost objects for reporting purposes. Enter the cost object group number and then change/add cost objects to hierarchy nodes.
KKH2
Change Cost Object Group
This transaction is used to change a cost object group. Enter the cost object group number and then change/add cost objects to hierarchy nodes.
KKH3
Display Cost Object Group
This transaction is used to display a cost object group. Enter the cost object group number

KKPH
Fast Entry for Cost Object Hierarchy
Use this transaction to create a cost object hierarchy that can be used to analyze target costs, actual costs, and variances in situations where costs are not collected at the level of orders or materials. With the fast entry function, you create the cost object nodes of a cost object hierarchy in a list screen. You can specify the level of the cost object nodes and define the top of the hierarchy.
KKPHIE
Edit: Cost Object Hierarchy
Use this transaction to create a cost object hierarchy that can be used to analyze target costs, actual costs, and variances in situations where costs are not collected at the level of orders or materials. With the structured entry method, the cost object hierarchy is shown as a graphic. You can specify the levels of the cost object nodes, define the top of the hierarchy, and assign single objects.
KKR0
Create Summarization Hierarchy
This transaction is used to create a summarization hierarchy, which is an analysis tool you can use to summarize values upwards in a hierarchical structure that you define. This makes it possible to analyze values and quantities at higher levels, such as at a plant level. Values in object currency are only summarized if the summarization hierarchy contains a plant or company code node. Summarized data can include planned, actual, target costs, variances and work in progress. Click the Create icon, enter the name and description of the summarization and then proceed to define the object types, the totals records and hierarchy to be summarized. Fill the summarization with data using transaction KKRC.
KKRC
Summarization: CO Object
Use this transaction to fill the summarization tables created using transaction KKR0. The data collection run is usually carried out for each summarization hierarchy after period-end closing in cost object controlling. The system reads the quantities and values of the selected objects as defined by the summarization hierarchy for the period being closed. This data is summarized upwards according to the structure of the hierarchy, and it is updated by period and cost element in the summarization objects. A summarization object is built for each field characteristic for all fields in a summarization hierarchy.
KKS1
Variance Calculation Cost Object Controlling by Order; Collective
This transaction is used to calculate production variances for a whole plant at one time. Production orders are the mechanism used to monitor the consumption of raw materials and plant expenses in the production of other inventories such as finished goods. Once overhead has been applied to a production order, production order variances can be calculated and then settled. Variances are calculated and reported in eight categories divided by input and output variances, such as price and quantity variance on the input side and lot size and output price variance on the output side.
KKS2
Variance Calculation Cost Object Controlling by Order; Individual
Use this transaction to calculate production variances for an individual production order. Production orders are the mechanism used to monitor the consumption of raw materials and

plant expenses in the production of other inventories such as finished goods. Once overhead has been applied to a production order, production order variances can be calculated and then settled. Variances are calculated and reported in eight categories divided by input and output variances, such as price and quantity variance on the input side and lot size and output price variance on the output side.
KKS5
Variance Calculation Cost Object Controlling by Period; Collective
This transaction is used to calculate production variances for a whole plant at one time. This transaction is used to calculate variances for product cost collectors in a period based cost object controlling scenario typically at the material level in a repetitive manufacturing environment. Once overhead has been applied to a product cost collector for the period, production variances can be calculated and then settled. Variances are calculated and reported in eight categories divided by input and output variances, such as price and quantity variance on the input side and lot size and output price variance on the output side.
KKS6
Variance Calculation Cost Object Controlling by Period; Individual
Use this transaction to calculate production variances for an individual product cost collector/material. This transaction is used to calculate variances for a product cost collector in a period based cost object controlling scenario typically at the material level in a repetitive manufacturing environment. Once overhead has been applied to a product cost collector for the period, production variances can be calculated and then settled. Variances are calculated and reported in eight categories divided by input and output variances, such as price and quantity variance on the input side and lot size and output price variance on the output side.
KL01
Create Activity Type
This transaction is used to create an activity type master record, which can be used, for example, in routings and production orders for machine time. These quantities of time (both planned quantities and actual quantities confirmed), when combined with activity prices drive the application of direct machine costs for product costing and production orders. Activity types are assigned to one controlling area and have a valid from/to date. Activity types typically contain a name, person responsible and category, which determines the method of activity quantity planning and activity allocation
KL02
Change Activity Type
Use this transaction to change the activity type master record. When combined with activity prices, activity types drive the application of activity costs for product costing and production orders.
KL03
Display Activity Type
Use this transaction to display the activity type master record. When combined with activity prices, activity types drive the application of activity costs for product costing and production orders.
KL04
Delete Activity Type
Use this transaction to delete an activity type master record individually. Note that there must be no plant transactional data existing in the controlling area.
KL05
Display Change Documents: Activity Type
Use this transaction to report all changes to an activity type. There is an option to select from a specific date, time and user ID of the individual making the change. The report output will display the fields changed with the option to drill down and display the old/new field value and date changed.
KL13
Display Activity Types
This transaction is used to display a list of activity types with the list being all activity types, an activity type group or an individual activity type.
KL14
Delete Activity Types
Use this transaction to delete an activity type master record individually, collectively or in a group. Note that there must be no plant transactional data exiting in the controlling area.
KLH1
Create Activity Type Group
This transaction is used to create an activity type group, which is a hierarchy structure of activity types. Activity type groups are used for reporting, allocations and/or in various planning functions, where it is desirable to display data at a high level of detail. Input the profit center group key and then click Enter to create the hierarchical structure with activity types assigned to the lowest level node.
KLH2
Change Activity Type Group
This transaction is used to change an activity type group, which is a hierarchy structure of activity types. Activity type groups are used for reporting, allocations and/or in various planning functions, where it is desirable to display data at a high level of detail. Input the profit center group key and click Enter to change the hierarchical structure.
KLH3
Display Activity Type Group
This transaction is used to display an activity type group, which is a hierarchy structure of activity types. Activity type groups are used for reporting, allocations and/or in various planning functions, where it is desirable to display data at a high level of detail. Input the profit center group key and click Enter to display the hierarchical structure.
KO01
Create Internal Order
Use this transaction to create an internal order/cost object that collects actual and plan revenues and costs, statistical and activity data. Internal orders typically collect and analyze actual and planned costs related to a specific project, event or asset under construction. The project/event will span several accounting periods and all costs can be settled in the period they were incurred. Internal orders typically contain a name, person responsible, assignment to an organizational unit and an order type, which determines the method of settlement.
KO02
Change Internal Order
This transaction is used to change an internal order/cost object that collects actual and plan revenues and costs, statistical and activity data. Internal orders typically collect and analyze actual and planned costs related to a specific project, event or asset under construction. Input the internal order number, click Enter and update the internal master record data fields.
KO03
Display Internal Order
This transaction is used to display an internal order/cost object that collects actual and plan revenues and costs, statistical and activity data. Internal orders typically collect and analyze actual and planned costs related to a specific project, event or asset under construction. Enter the internal order number, click Enter and display the internal master record data fields.
KO04
Order Manager
This transaction is used to create/change an internal order using a graphical user interface. An internal order worklist can be created and used to facilitate changes to multiple orders at the same time. You can also create new orders or copy an existing order in the worklist. You can also select single orders and process them using collective processing for orders, which enables multiple changes at one time.
KO12
Change Overall Planning
Use this transaction to input an overall plan for the internal order. This type of planning is performed independently from cost elements. You can enter the plan for the lifetime of the order or an annual plan in each fiscal year. Note: An overall plan can be changed using this transaction; however, the original values are not maintained separately.
KO13
Display Overall Planning
This transaction is used to display an overall plan for an internal order. This type of planning is performed independently from cost elements. The plan may be for the lifetime of the order or an annual plan entered in each fiscal year.
KO14
Copy Planning
Use this transaction to create a new plan for internal orders by copying an existing plan version. You can copy primary costs, revenues, secondary costs, activity data, fiscal year dependent and independent overall planning values, unit cost values, detailed planning and statistical key figure values together or in any combination. Additionally, data can be copied period by period, several periods at a time or for an entire year. Before a version can be referenced, the "copying allowed" parameter must be activated in the planning version parameters.
KO15
Copy Actual to Plan
This transaction is similar to transaction KO14 but allows you to create an internal order plan from actual costs. All data types can be copied individually, all together or in many combinations. Additionally, data can be copied period by period, several periods at a time or for an entire year.
KO22
Change Original Budget

Use this transaction to change the original budget, which is an approved cost structure for an internal order or an order group. A budget is more controlled and binding than a plan and can be subject to availability control. The original budget should be changed, using this transaction, with the best estimation of costs. Unforeseen events, such as price increases, and so on, may require corrections to the original budget, which can be maintained using supplements (transaction code KO24) and returns (KO26). Use a supplement to increase the current budget or a return to decrease the current budget.
KO23
Display Original Budget
This transaction is used to display the original budget. A budget is more controlled and binding than a plan and can be subject to availability control. Input the internal order or internal order group and internal order type and click the Original Budget icon.
KO24
Change Supplement
Use this transaction to make changes to the original budget. If the funds provided in the original budget are not sufficient, the system enables you to use budget supplements. Changes are managed as line items in the system and are therefore managed separately from the original budget. The time to lock down a budget as an original budget, and to update it with supplements, returns and transfers depends on when you want to log data origins, in other words the sender-receiver relationships for the updates. You therefore use budget updates to prove where supplements and returns originated, and where they are to be used. You do this using status management.
KO25
Display Supplement
This transaction is used to display changes to the original budget. If the funds provided in the original budget are not sufficient, the system enables you to use budget supplements. Changes are managed as line items in the system and are therefore managed separately from the original budget. Input the internal order or internal order group and type and click
the Supplement icon.
KO26
Change Return
Use this transaction to make changes to the original budget. Using this transaction you can return funds, i.e., reduce the original budget for unused funds. Changes are managed as line items in the system and are therefore managed separately from the original budget. You therefore use budget updates to prove where supplements and returns originated, and where they are to be used.
KO27
Display Return
This transaction is used to display changes to the original budget. Using this transaction you can display reductions to the original budget for unused funds. Changes are managed as line items in the system and are therefore managed separately from the original budget. You therefore use budget updates to prove where supplements and returns originated, and where they are to be used.
KO30
Activate Availability Control exceeded (either by actual costs or commitments). When purchase requisitions or purchase orders, for example, are posted to an investment order that has been budgeted, the system checks whether the posting causes the predefined tolerance limits to be exceeded. If it does, then the system automatically issues either a warning or error message (depending on customizing settings).
KO32
Deactivate Availability Control
Use this transaction to deactivate availability control previously activated using transaction KO30.
KO88
Actual Settlement: Order
Use this transaction to settle actual primary and secondary costs and revenues (if applicable) to the receivers established in a production/internal order's settlement rules. In costing, production/internal orders are interim cost collectors that are used to plan, record actual costs and monitor costs until certain activities have been completed and the costs move to their final destination. This movement of the costs to their final destination is called settlement. The order's settlement rules are dependent on the parameters established in the settlement structure, settlement profile, and order type (all defined in customizing and in the master data itself).
KO8B
Display Settlement Document
Use this transaction if you know the settlement document number posted via transaction KO88. However, an alternative way to review the settlement posting is going to transaction KO88, inputting your selection criteria and via the menu path selecting Go to • Previous Settlement. Either way, the information about the settlement is displayed such as the settlement senders/receivers, the amount calculated and distributed.
KO8G
Actual Settlement: Orders
This transaction is used to settle actual costs of multiple internal orders at the same time. A selection variant has to be created beforehand in order to select the internal order range. The selection method can be changed to internal orders used in CRM or cProjects order if these components are being used. Select the settlement period and fiscal year variant and click
Execute.
KO9E
Planned Settlement: Internal Orders; Individual
Use this transaction to settle plan primary and secondary costs and revenues to the receivers established in an internal order's settlement rules. In costing, production/internal orders are interim cost collectors that are used to plan, record actual costs and monitor costs until certain activities have been completed and the costs move to their final destination. This movement of the costs to their final destination is called settlement. This transaction is the plan cost (as opposed to actual cost) equivalent of transaction KO88.
KO9G
Planned Settlement: Internal Orders; Collective

Execute. This transaction is the plan cost (as opposed to actual cost) equivalent of transaction KO8G.
KOB1
Display Actual Cost Line Items for Orders
Use this transaction to display detailed line items for internal order actual posting documents. Actual line items are created with every posting of actual costs. They contain information about the posted amount, the posting date, and the user who posted the line item. When you start an actual line item report, you need to limit the line items to be read by entering an order (or order group), a cost element (or cost element group), and a posting period. Additionally, you can configure different layouts to control the appearance of the report.
KOB2
Display Commitment Line Items for Orders
Use this transaction to display the details for commitment line items that are created as a commitment in the set up, for example, for a purchase order. The line item contains information about the posted amount, the posting date, and the user who posted the item. When you start a line item report, you need to limit the line items to be read by entering an order (or order group), a cost element (or cost element group) and a posting period. Additionally, you can configure different layouts to control the appearance of the report.
KOB3
Display Variance Line Items for Orders
Use this transaction to display details for variance line items created via the variance calculation function (transaction KKS1 and KKS2). The line items can display, by target cost version the variance categories calculated. The line item contains information about the posted amount, the posting date, and the user who posted the item. When you start a line item report, you need to limit the line items to be read by entering an order (or order group), a cost element (or cost element group) and a posting period. Additionally, you can configure different layouts to control the appearance of the report.
KOB4
Display Budget Line Items for Orders
This transaction displays budgeting documents in ascending order. This way you can see how a particular budget came about. This report is therefore particularly suitable for monitoring the budgeting process. However, it cannot be used to display how much budget a particular funds management account assignment actually has.
KOB8
Display Results Analysis Line Items for Orders
Use this transaction to display the line items generated from the results analysis/work in progress calculation via transaction KKAX or KKAO. Results analysis valuates the relationship between the costs and a measure of the order's progress toward completion and thus the amount that can be capitalized as work in progress. This transaction displays the results of the results analysis execution. Note: In customizing the Generate Line Item indicator must be turned on for the results analysis version report to display the line items.
KOC4
Order Selection
This transaction is used to generate a list of orders with the associated master data fields and key figures. The results list has a number of navigation and formatting options and can be modified by the user. From the results list in the detailed report, you can branch off to

single orders or to a comparison of two orders, in order to examine these orders more closely. You can also go to the master data display for characteristics from the results list. Furthermore, you can drill down into the material master record for an order to be analyzed. Order selection is not a summarized analysis and is not based on classification. It mainly serves to answer specific questions/queries that arise in cost object controlling.
KOCF
Fiscal Year Close: Carry Forward Commitment
Use this transaction to carry forward commitments (for example, purchase requisitions, purchase orders, earmarked funds) posted in the current fiscal year but not reduced until the following fiscal year. The commitment carried forward then debits the budget in the new fiscal year.
KOCO
Budget Carry Forward for Orders
This transaction enables you to carry forward budget remainders from projects, internal orders, and plant maintenance orders to the following fiscal year. A budget that has not been used up is mainly defined here as the difference between the planned budget and incurred actual costs. Budgets carried forward to the following year can also be posted to the previous year in certain circumstances.
KOH1
Create Order Group
Use this transaction to create internal order groups. Internal order groups are very flexible structures and can be used in collective processing (master data and transactional data), reporting, allocations, and authorization objects. Each sub group represents a level of summarization. Internal order groups are unique within a controlling area.
KOH2
Change Order Group
Use this transaction to change an internal order group. Internal order groups as well as orders can be added, deleted or reassigned using this transaction. Order groups are very flexible structures and can be used in other order groups, collective processing (master data and transactional data), reporting, allocations, and authorization objects. Each sub group represents a level of summarization. Internal order groups are unique within a controlling area, but client dependent.
KOH3
Display Order Group
This transaction is used to display an internal order group. Internal order groups are very flexible structures and can be used in collective processing (master data and transactional data), reporting, allocations, and authorization objects. Each sub group represents a level of summarization. Internal order groups are unique within a controlling area.
KOK2
Collective Processing for Internal Orders
KOK3
Collective Display for Internal Orders

Use this transaction to display multiple internal order master records using manual collective processing. The user can toggle between available line display variants or drill down to the specific internal order master data and settlement rule.
KOK4
Automatic Collective Processing for Internal Orders
Use this transaction to make changes to multiple internal order master records using automatic collective processing. This transaction differs from the manual collective processing using transaction KOK2 in that both the order selection and the change function are performed within one transaction.
KP04
Set Planner Profile
This transaction is used to set the default planner profile to be used with transactions such as KP06 and KP26. Perform this procedure when the planner profile default needs to be changed to accommodate subsequent planning activities. When planning in cost center accounting and profit center accounting, a planning profile is used to direct the kind of information the user enters. The planning template aids the user's planning process since not all fields need to be available for every planning activity.
KP06
Change CElem/Activity Input Planning
Use this transaction for primary cost planning, i.e., costs due to external procurement or material withdrawals. Activity-independent (only to cost center) and activity-specific (to cost center/activity type) primary costs can be planned. In order to calculate activity prices automatically you have to plan activity-specific primary costs with corresponding activity outputs that have been planned for the sender cost center. In other words, within an agreed activity plan, the sender cost centers provide activity quantities because other cost centers have planned to consume them. You use transaction KSC6 to calculate activity prices automatically.
KP07
Display Planning CElem/Act. Input
Use this transaction to display primary cost planning, i.e., costs due to external procurement or material withdrawals. Activity-independent (only to cost center) and activity-specific (to cost center/activity type) primary costs can be planned.
KP26
Change Activity Type/Price Planning
Use this transaction to plan activity prices manually for cost centers. You plan the activity price of an activity type of a sender cost center, which can be used as the basis for cost allocations to receiver cost objects via a secondary cost element posting. If you have not manually planned the prices during activity type planning, SAP can calculate the debit for the receiver cost centers using an iteratively calculated price via transaction KSC6.
KP27
Display Activity Type/Price Planning
KP46
Change Statistical Key Figure Planning

This transaction is used to plan for statistical key figures. For example, as a key figure, you can plan costs per the number of employees using this transaction. Furthermore, you can use the number of employees as an allocation base, i.e., to allocate cafeteria costs among cost centers based on number of employees in that cost center.
KP47
Display Statistical Key Figure Planning
This transaction is used to display a plan for statistical key figures.
KP90
Delete Planned Costs (All Integrated Planning Objects)
Use this transaction to delete particular planning data (including very large amounts) from the CO tables. This deletes the planning data on objects that are integrated with planning. This includes the following objects, cost centers, business processes, internal orders and projects, for which planning integration is active in both the version and the master data.
KP98
Copy Actual to Plan
This transaction is used during the planning process and offers a method of reusing large parts of your actual data to generate plan data. It allows actual data to be transferred to plan values within a fiscal year, across different periods or within different versions. You can copy within fiscal years, periods, versions, and cost centers. Try to avoid using the Reset and Overwrite option because the system needs to read all the data in the target version in order to clear it.
KP9R
Copy CO Resource Prices
Use this transaction to copy resource prices, which are the equivalent of activity prices but for external activities. Resource prices are used to plan/valuate the cost of consuming business activities by cost object such as cost centers. The transaction enables you to copy resource prices from one target plan version/fiscal year to another.
KPD6
Change Statistical Key Figure Planning
This transaction is used to enter plan statistical key figure data for internal orders, which can be used as a basis for internal allocations, such as distributions and assessments and key figure analysis. Statistical key figures can be planned on a cost center, internal order, or other cost objects. Enter the document date, posting date, select the screen variant, the statistical key figure, the receiving cost center or internal order and quantity to be posted and save.
KPD7
Display Statistical Key Figure Planning
This transaction is used to display plan data for statistical key figures for internal orders, which can be used as a basis for internal allocations, such as distributions and assessments and key figure analysis. Statistical key figures can be planned on a cost center, internal order, or other cost objects. Input the document number, click Enter and the posting is displayed.
KPF6
Planning CEIem/Activity Input
Use this transaction to plan primary costs for internal orders. You can plan an overall value

for the internal order or plan annual values. Enter a plan version, from/to period, fiscal year, internal order from/to or internal order group and cost element from/to or cost element group, click Overview and proceed to the planning screen.
KPF7
Display CEIem./Acty Input Planning
This transaction is used to display plan primary costs of for internal orders. You can display the plan at an overall plan for the internal order or for an annual plan. Enter a plan version, from/to period, fiscal year, internal order from/to or an internal order group and cost element from/to or cost element group, click Overview and proceed to the planning screen.
KPG5
Report Painter: Create Orders: Planning Layout for Cost Elements/Active
Use this transaction to create a planning layout for internal order planning. The planning layout can be customized to suit your planning requirements. This involves selecting a lead column, typically the cost element characteristic, and then the planning key figures, such as the total plan in the controlling area currency or total plan in the transaction currency. Furthermore, a number of formatting options are also available. Once saved, the planning layout can then be used via transaction KPF6 (Change CEIem/Activity Input Planning).
KPG6
Report Painter: Change Orders: Planning Layout for Cost Elements/Active
This transaction can be used to change the planning layout, previously created using transaction KPG5.
KPSI
Execute Plan Reconciliation
Use this transaction to reconcile plan activity input and output. Because activity output and input can be planned separately there can be differences if, for example, only the activity output is changed. In this case the planning networked has to be reconciled again. This transaction will show how the planning change affects the planning network.
KRMI
Display Actual Cost Line Items for Orders
Use this transaction to display detailed line items for product cost collector actual postings. Actual line items are created with every posting of actual costs. They contain information about the posted amount, posting date, and the user who posted the item. Enter the material, plant, production process and date from/to an order and execute. Additionally, you can configure different layouts to control the appearance of the report.
KSOl
Create Cost Center
This transaction is used to create a cost center, which is part of the controlling module master data. Cost centers are distinct cost objects/cost collectors that can sub divide the organization by function, process and responsibility. Cost centers can be planned, actual postings recorded and used for cost allocations. Cost centers can be grouped for summarization and hierarchically structured for drill down reporting. Enter the cost center number, valid from/to dates, click Enter and maintain master data fields such as description/name, cost center category and person responsible. Note that one easy way to create a new cost center is to use an existing cost center as a reference and then change the few fields required for the new cost center and save it.
KS02

Use this transaction to change a cost center previously created using transaction KS01.
KS03
Display Cost Center
Use this transaction to display a cost center previously created using transaction KS01.
KS04
Delete Cost Center; Individual
This transaction is used to delete a cost center but deletion is only effective if there are no postings to the cost center. In other words, it is simply not enough to reverse any postings to the cost center in order to delete it. One option, as an alternative to deleting the cost center, would be to render the cost center inactive by shortening its effective to date, so that the cost center cannot be posted to from that date onwards.
KS05
Display Change Documents: Cost Center
Use this transaction to report all changes to a cost center. There is an option to select from a specific date and the user ID of the individual making the change. The report output will display the fields changed with the option to drill down and display the old/new field value and date changed.
KS12
Change Cost Centers
This transaction can be used to change multiple cost centers at one time. Select cost centers in a specific valid from/to period and then change the cost centers to overwrite the entries in the available for input fields and save your entries.
KS13
Display Cost Centers
Use this report to display a list of cost centers that may have been changed using transaction KS12.
KS14
Delete Cost Centers; Collective
This transaction is used to delete multiple cost centers at the same time but is effective only if there are no postings to the cost center. In other words, it is simply not enough to reverse any postings to the cost center in order to delete it. One option, as an alternative to deleting the cost center, would be to render the cost center inactive by shortening its effective to date, so that the cost center cannot be posted to from that date onwards.
KSB1
Display Actual Cost Line Items for Cost Centers
Use this transaction to display detailed line items for cost center actual postings. Actual line items are created with every posting of actual costs. They contain information about the posted amount, the posting date, and the user who posted the item. When you start an actual line item report, you need to limit the line items to be read by entering a cost center (or cost center group), a cost element (or cost element group) and a posting period. Additionally, you can configure different layouts to control the appearance of the report.
KSB2

Display Commitment Line Items for Cost Centers
Use this transaction to display detailed line items for commitment line item postings on a cost center that has been created for commitments, for example, for a purchase order. The line item contains information about the posted amount, the posting date, and the user who posted the item. When you start a line item report, you need to limit the line items to be read by entering a cost center (or cost center group), a cost element (or cost element group) and a posting period. Additionally, you can configure different layouts to control the appearance of the report.
KSBP
Display Plan Cost Line Items for Cost Centers
Use this transaction to display detailed line items for cost center plan postings. The line item displays information about the planned amount, the posting date, and the user who posted the item. When you start a plan line item report, you need to limit the line items to be read by entering a cost center (or cost center group), a cost element (or cost element group) and a posting period. Additionally, you can configure different layouts to control the appearance of the report.
KSBT
Activity Type Price Report
Use this transaction to report on cost center activity prices created automatically by activity price calculation or manually created by activity price input planning using transaction KP26. Input the cost center, activity type, planning version, fiscal year, from period and click Execute to display the results.
KSC1
Create Cycle for Actual Indirect Activity Allocation
Use this transaction to create a cost allocation cycle for actual indirect activity allocation, which is a method of allocating total activity quantity from senders cost centers to the receiver cost centers based on the receiver activity posted in the receiver cost center. For example, in manufacturing, you can allocate overhead costs from a cost center from which the expenses are posted, to a production cost center that uses the overhead.
KSC2
Change Cycle for Actual Indirect Activity Allocation
This transaction is used to change an actual indirect activity allocation cycle previously created using transaction KSC1.
KSC3
Display Cycle for Actual Indirect Activity Allocation
This transaction is used to display an actual indirect activity allocation cycle previously created using transaction KSC1.
KSC4
Delete Cycle for Actual Indirect Activity Allocation
This transaction is used to delete an actual indirect activity allocation cycle previously created using transaction KSC1.
KSC5
Execute Cycle for Actual Indirect Activity Allocation

on the receiver activity posted in the receiver cost center. For example, in manufacturing, you can allocate overhead costs from a cost center from which the expenses are posted, to a production cost center that uses the overhead. Enter the period you want to run the allocation for, the cycle created using transaction KSC1 and execute. The program can also run in test mode with or without a detail list showing the allocation in the output.
KSC6
Act. Indirect Acty Alloc.: Overview
This transaction can be used to list an overview of the indirect activity allocation postings executed using transaction KSC5.
KSC7
Create Cycle for Planned Indirect Activity Allocation
Use this transaction to create an allocation cycle for plan cost indirect activity allocation, which is a method of allocating total activity quantity from senders cost centers to the receiver cost centers based on the receiver activity planned in the receiver cost center. For example, in manufacturing, you can allocate plan overhead costs from a cost center from which the expenses are posted, to a production cost center that uses the overhead.
KSC8
Change Cycle for Planned Indirect Activity Allocation
This transaction is used to change a plan cost indirect activity allocation cycle previously created using transaction KSC7.
KSC9
Display Cycle for Planned Indirect Activity Allocation
This transaction is used to display a plan cost indirect activity allocation cycle previously created using transaction KSC7.
KSCB
Execute Plan Indirect Acty Alloc.
Use this transaction to execute an allocation cycle for plan cost indirect activity allocation, which is a method of allocating total activity quantity from senders cost centers to the receiver cost centers based on the receiver activity planned in the receiver cost center. For example, in manufacturing, you can allocate plan overhead costs from a cost center from which the expenses are posted, to a production cost center that uses the overhead. Enter the period you want to run the allocation for and the cycle created using transaction KSC7 and execute. The program can also run in test mode with or without a detail list showing the allocation in the output.
KSCC
Document List for Selected Cycle
This transaction can be used to list an overview of the indirect activity allocation postings executed using transaction KSCB.
KSH1
Create Cost Center Croup

KSH2
Change Cost Center Croup
KSH3
Display Cost Center Croup
Use this transaction to display a cost center group previously created using transaction KSH1.
KSII
Actual Price Calculation
This transaction calculates an activity price by taking into account the exchange of activity between cost centers. Actual price calculation, which you can carry out during planning, is based on planned costs and activity. The resulting prices are used to valuate actual activity. After running actual price calculation, you can choose to recalculate actual activity based on actual prices.
KSS2
Actual Cost Splitting
This transaction is used to split activity independent costs into activity type dependent costs if more than one activity type exists on the cost center. Costs can be split according to costs from the cost center to different activities based on equivalence numbers or actual activity. You must split plan costs before executing activity price calculation and plan/target/actual comparison reporting.
KSS4
Plan Cost Splitting
Use this transaction to split the activity-independent plan costs of a cost center among the activity types of this cost center. You must split plan costs before executing plan activity price calculation and plan/target/actual comparison reporting. To split plan costs, you must first plan the corresponding values in activity type planning.
KSU1N
Create Actual Assessment Cycle
This transaction is used to set up the senders, receivers and distribution rules for an actual assessment posting using transaction KSU5. Assessments apportion costs collected within a cost center during the accounting period to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that assessments use a secondary cost element to post to the receiver cost center, which leaves the original posting visible in the sender cost center.
KSU2N
Change Actual Assessment Cycle
Use this transaction to change an assessment cycle previously created using transaction KSU1N.
KSU3N
Display Actual Assessment Cycle
Use this transaction to display an assessment cycle previously created using transaction KSU1N.

KSU4N
Delete Actual Assessment Cycle
KSU5
Execute Actual Assessment
This transaction is used to allocate/apportion actual costs collected within a cost center during the accounting period to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that assessments use a secondary cost element to post actual costs to the receiver cost centers, which leaves the original posting visible in the sender cost center.
KSU6
Document List for Selected Cycle
Use this transaction to review the controlling documents posted as a result of executing KSU5 in update mode.
KSU7N
Create Plan Assessment Cycle
This transaction is used to set up the senders, receivers and distribution rules for a plan assessment posting using transaction KSUB. Assessments apportion plan costs within a cost center in a period to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that assessments use a secondary cost element to post plan costs to the receiver cost centers, which leaves the original plan posting visible in the sender cost center.
KSU8N
Change Plan Assessment Cycle
Use this transaction to change a plan assessment cycle previously created using transaction KSU7N.
KSU9N
Display Plan Assessment Cycle
Use this transaction to display a plan assessment cycle previously created using transaction KSU7N.
KSUAN
Delete Plan Assessment Cycle
Use this transaction to delete a plan assessment cycle previously created using transaction KSU7N.
KSUB
Execute Plan Assessment
This transaction is used to allocate/apportion plan costs within a cost center during an accounting period to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that assessments use a secondary cost element to post plan costs to the receiver cost centers, which leaves the original plan posting visible in the sender cost center.
KSUCN

Use this transaction to review the controlling documents posted as a result of executing KSUB in update mode.
KSPI
Plan Price Calculation
This transaction is used to determine prices for the plan activity types of each cost center. The system calculates the prices iteratively by dividing the plan costs by the plan activity quantity. It is also possible to determine the fixed portion of the price as the quotient (ratio) of plan costs and capacity.
KSV1N
Create Actual Distribution Cycle
This transaction is used to set up the senders, receivers and distribution rules for a distribution actual posting using transaction KSV5. Distributions allocate primary costs collected within a cost center during the accounting period to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that a distribution posts using the primary cost element, which means the original cost gets posted into the receiving cost centers.
KSV2N
Change Actual Distribution Cycle
Use this transaction to change an actual distribution cycle previously created using transaction KSV1N.
KSV3N
Display Actual Distribution Cycle
Use this transaction to display an actual distribution cycle previously created using transaction KSV1N.
KSV4N
Delete Actual Distribution Cycle
Use this transaction to delete an actual distribution cycle previously created using transaction KSV1N.
KSV5
Execute Actual Distribution
This transaction is used to allocate/apportion actual costs collected within a cost center during the accounting period to receiver cost centers according to user-defined distribution rules. Distributions allocate primary costs collected within a cost center during the accounting period to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that a distribution posts costs using the primary cost element, which means the original cost gets posted into the receiving cost centers.
KSV6N
Actual Distribution: Overview
Use this transaction to review the controlling documents posted as a result of executing KSV5 in update mode.
KSV7N
This transaction is used to set up the senders, receivers and distribution rules for a plan distribution posting using transaction KSVB. Distributions allocate plan costs posted within a cost center during the accounting period to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that a distribution posts plan costs using the primary cost element, which means the original plan gets posted into the receiving cost centers.
KSV8N
Change Plan Distribution Cycle
Use this transaction to change a plan distribution cycle previously created using transaction KSV7N.
KSV9N
Display Plan Distribution Cycle
Use this transaction to display a plan distribution cycle previously created using transaction KSV7N.
KSVAN
Delete Plan Distribution Cycle
Use this transaction to delete a plan distribution cycle previously created using transaction KSV7N.
KSVB
Execute Plan Cost Distribution
This transaction is used to allocate/apportion plan costs within a cost center to receiver cost centers according to user-defined distribution rules. The difference between a distribution and an assessment is that a distribution posts plan costs using the primary cost element, which means the original cost gets posted into the receiving cost centers.
KSVC
Plan Distribution: Overview
Use this transaction to review the controlling documents posted as a result of executing KSVB in update mode.
KSW1
Create Actual Periodic Reposting Cycle
This transaction is used to create a cycle for reposting actual costs. Reporting costs is an easy way to repost costs from, for example, an administration cost center to cost centers that consume the costs, such as manufacturing departments. The sender cost center is not updated with this method. To define a periodic reposting, create a cycle, create segments for the cycle to specify the sender/receiver cost center relationship and specify the tracing factors for the apportionment.
KSW2
Change Actual Periodic Reposting Cycle
Use this transaction to change the reposting cycle created using transaction KSW1.
KSW3
Display Actual Periodic Reposting Cycle
Use this transaction to display the reposting cycle created using transaction KSW1.
KSW5
Execute Actual Periodic Reposting Cycle
This transaction is typically used as an easy way to repost actual costs from, for example, an administration cost center to cost centers that consume the costs, such as manufacturing departments. Periodic reposting uses the original cost element, meaning the primary cost element remains intact. When you allocate telephone costs, for example, the allocating cost center is unimportant for the receiving cost centers. The system therefore stores data records for periodic reposting in a way that uses less memory than a distribution. The sender cost center is not updated with this method. To define a periodic reposting, use the cycle created via transaction KSW1 with segments for the cycle and also tracing factors for the apportionment.
KSW7
Create Plan Periodic Reposting Cycle
This transaction is used to create a cycle for reposting plan costs. Reposting costs is an easy way to repost costs from, for example, an administration cost center to cost centers that consume the costs, such as manufacturing departments. The sender cost center is not updated with this method. To define a periodic reposting, you create segments and tracing factors for the apportionment. Use transaction KSWB to execute the reposting.
KSW8
Change Plan Periodic Reposting Cycle
Use this transaction to change the reposting cycle created using transaction KSW7.
KSW9
Display Plan Periodic Reposting Cycle
Use this transaction to display the reposting cycle created using transaction KSW7.
KSWA
Delete Plan Periodic Reposting Cycle
Use this transaction to delete the reposting cycle created using transaction KSW7.
KSWB
Execute Plan Periodic Reposting
This transaction is used as an easy way to repost plan costs from, for example, an administration cost center to cost centers that consume the costs, such as manufacturing departments. Periodic reposting uses the original cost element, meaning the primary cost element remains intact. When you allocate plan telephone costs, for example, the allocating cost center is unimportant for the receiving cost centers. The system therefore stores data records for periodic reposting in a way that uses less memory than a distribution. The sender cost center is not updated with this method. To define a periodic reposting, use the cycle created via transaction KSW7 with segments for the cycle and also tracing factors for the apportionment.
KVA5
Transfer Actual Data from LIS Activity-Independent Statistical Key Figures, US
This transaction is used to transfer statistical key figure data collected in the logistics information system to cost center accounting. This data can then be used, for example, in

allocations. This transaction transfers data that is not linked to any particular activity type.
KVD5
Transfer Actual Data from LIS Activity-Dependent Statistical Key Figures, US
This transaction is used to transfer statistical key figure data collected in the logistics information system to cost center accounting. This data can then be used, for example, in allocations. This transaction transfers activity dependent statistical key figures.
OKP1
Maintain Period Lock
This transaction is used to open and close the controlling area posting periods. This is a separate table from the finance posting period table maintained via transaction OB52. The period lock in the controlling module can be maintained for both actual and plan postings.
OKP2
Display Period Lock
Use this transaction to display the controlling period lock table maintained via transaction OKP1.